2 thoughts on “How about engineering cost?”

  1. The professional development prospects of engineering costs are very good, the potential of occupational development, comprehensive employment capabilities, wide employment, strong employment competitiveness, and considerable income.
    If project cost professional categories:
    1. Civil engineering category:
    Plores to learn such professional friends will go to construction and consulting units. The difficulty factor is also very high, after all, a project is hundreds of millions. Generally, this type of cost is to review construction fees, engineering settlement, cost monitoring, engineering changes and visas, etc., including earthwork, foundation, structure, doors and windows, waterproof, etc. Due to the internal decoration, the production of various new materials and new processes needs to go to the market for price comparison, and there are some difficulties in the tedious work content.
    2. Installation engineering:
    is mainly responsible for water supply, drainage, medium water, fire alarm, ventilation, air -conditioning water, cooling water, power, lighting, lightning protection system, gas, heat, purifying water Systems, sewage treatment systems, power distribution systems, boilers, generators, elevators, etc. The installation of the knowledge of the person in charge is very high, and there are certain requirements for professionalism. However, there are many things in common in terms of budget, most of which are composed of pipelines and affiliated projects.
    3. Water conservancy engineering:
    mainly is the investment estimate of the proposal of the water conservancy project construction project, the feasibility research investment estimate, the preliminary design budget, the business terms of the bidding documents, the draft bidding draft, and the project management stage of the construction implementation stage The calculation of the budget and price difference and the completion settlement report and the implementation of the contract. The departments of the water conservancy cost engineer are generally state -owned enterprises or business departments. State -owned enterprises' public institutions can be more stable and good for benefits, but the salary level may not be very good high.
    4. Transportation engineering category:
    The engineer of the Ministry of Transportation focuses on road tunnel projects. It is mainly responsible for the budget preparation of municipal roads and bridges, rail transit projects, design estimates, construction drawing budgets, calculation review of engineering volume, etc. Essence This type of cost work market is small, and there are not many employment opportunities.

  2. Generally speaking, the engineering cost is relatively good, which is needed by major buildings, construction, bidding, management and other companies. Candidates can also choose the major.
    The project cost training goals:
    Te project cost professional training morality, wisdom, physical, and beautiful development, good professional ethics and humanistic literacy, master the basic knowledge of engineering cost, have determining engineering cost, engineering cost management capabilities , High -quality technical and skillful talents engaged in engineering design budget preparation, engineering construction drawing budget preparation, engineering quantity list preparation, bidding quotation preparation, engineering settlement compilation, etc.
    The employment direction of engineering cost:
    The main orientation of construction, design units and construction enterprises, in engineering cost consulting, bidding agent, engineering supervision, engineering consulting or engineering cost management post group, engaged in engineering design preparation, compilation of project design, and preparation, Engineering construction map budget preparation, engineering quantity list preparation, engineering bid quotation preparation, engineering settlement preparation and other work.

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart
Scroll to Top
Scroll to Top